生产营运经理的英文简历范本
“劉九期”通过精心收集,向本站投稿了19篇生产营运经理的英文简历范本,以下是小编为大家整理后的生产营运经理的英文简历范本,希望能够帮助到大家。
篇1:生产营运经理英文简历
生产营运经理英文简历模板
Name: BorisCao
Gender: Male
Date of Birth: 1965/07/04
Residency: TIANJIN
Work Experience:>10 years
Current Salary: *********RMB /Year
Address: **************
Desire Salary: ******RMB/Year
Email: ************@westrac.com.cn
Mobile: 13************
Desired Position:Production/Operation Manager
Particularly effective in increasing productivity and capacity. Demonstrated ability to learn new skills quickly.
Excellent interpersonal skills. Gained reputation for honesty and placed in a position of trust.
Work Experience
/09--Now:********** Ltd.
Industry: Manufacturing (Machinery, Equipment)
Project/Production Manager
As Project Manager and Operation Manager responsible for new company new workshop construction project management work.
Report Directly to: General Manager
Number of Subordinate: 40
Achievements:
As company site project manager finish 12,000m2 workshop construction and design management work.
Objective. In construction period, work with project management team finish two 6-Sigma projects that save construction cost 60KUSD material cost.
Get Company Excellent Employee Award in .
As coordinator and Deployment Champion lead 3 Black Belt to finish all employee Green Belt training and finish four 6 -Sigma project.
/02--2003/09:********** Co. Ltd.
Industry: Electronics/Semiconductor
Production Manager
Jan.-- Sep.2003: ********
As a production manager is responsible for production managing to fulfill plan coordination as required between planning, logistics, warehouse and other departments
Responsible for 6-sigma project deployment in production line.
The total subordinates are 350 people. The Goal and daily work is production plan set up
Jan.1994 -Jan.1996. ************* Company Ltd.
Working with DAVY International Engineer for the whole DRI Plant Electric and Instrumentation equipment detail designed liaison in England for 3 months.
As an electric engineer was responsible for the Steelwork Plant Electric ARC furnace area's electric equipment installation commissioning.
At same year get GM's promotion award (E08).
.7 Finish Non-polish line Etch and 4-Way lapping process lunch and efficiency improve 30%. At same year get promotion (E06).
Education
/11--/12: Tian Jin Financial & Economical University Master of Business Administration (MBA )
1984/09--1988/07: Beijing Science and Technology University Electrical Engineering And Automation Bachelor
Training
1996/02--Present:***********training center
6 Sigma, DAMIC, Project Management,
Language Skills
English VERY GOOD
篇2:生产营运经理英文简历
生产营运经理英文简历模板
Basic message
Full name: Cao *
Sexual distinction: Male
Give unripe date: On July 4, 1965
Occupy a dwelling place: Tianjin city
Working fixed number of year: 10 years of above
Firewood of item the year before last year: 10 thousand RMBs of * *
Address: In * of * of area of * of Tianjin city *
Expectation yearly salary: 10 thousand RMBs of * * *
Email: @yjbys.com.cn of * of * of * of * * *
Mobile telephone: * of * of * of * of * of * of 137 * *
Ego evaluation
Oneself are a job the active and serious and responsible, active, person that is good at group work, thinking is rigorous, have higher technical level and rich administrative experience. Suit to be engaged in an electron / mechanical product production and quality are high management heads the work.
Intent of to apply for a job
Working property: Full-time
Hope industry: Electronic technology / semiconductor, make (machinery / equipment) , communication / telegraphic (equipment, operation, appreciation serves)
Target place: Beijing, tianjin city
Target function: Produce battalion carry manager,
Working experience
2003/09- - up to now: Limited company of * * mechanical equipment
What belong to an industry: Make (mechanical / equipment)
Project of project government department is built / manager of manufacturing battalion carry
Responsible corporation builds workshop project management, design / construction / invite public bidding is purchased, reach spot management final acceptable the job (12, workshop of 000 square metre) . Be in charge of company quality at the same time / safety
篇3:生产营运经理英文简历制作
Name: BorisCao
Gender: Male
Date of Birth: 1965/07/04
Residency: TIANJIN
Work Experience:>10 years
Current Salary: *********RMB /Year
Address:**************
Desire Salary: ******RMB/Year
Email: ************@westrac.com.cn
Mobile: 13************
Desired Position:Production/Operation Manager
Particularly effective in increasing productivity and capacity. Demonstrated ability to learn new skills quickly.
Excellent interpersonal skills. Gained reputation for honesty and placed in a position of trust.
Work Experience
/09--Now:********** Ltd.
Industry: Manufacturing (Machinery, Equipment)
Project/Production Manager
As Project Manager and Operation Manager responsible for new company new workshop construction project management work.
Report Directly to: General Manager
Number of Subordinate: 40
Achievements:
As company site project manager finish 12,000m2 workshop construction and design management work.
Objective. In construction period, work with project management team finish two 6-Sigma projects that save construction cost 60KUSD material cost.
Get Company Excellent Employee Award in .
As coordinator and Deployment Champion lead 3 Black Belt to finish all employee Green Belt training and finish four 6 -Sigma project.
/02--2003/09:********** Co. Ltd.
Industry: Electronics/Semiconductor
Production Manager
Jan.-- Sep.2003:********
As a production manager is responsible for production managing to fulfill plan coordination as required between planning, logistics, warehouse and other departments
Responsible for 6-sigma project deployment in production line.
The total subordinates are 350 people. The Goal and daily work is production plan set up
Jan.1994 -Jan.1996.************* Company Ltd.
Working with DAVY International Engineer for the whole DRI Plant Electric and Instrumentation equipment detail designed liaison in England for 3 months.
As an electric engineer was responsible for the Steelwork Plant Electric ARC furnace area's electric equipment installation commissioning.
At same year get GM's promotion award (E08).
.7 Finish Non-polish line Etch and 4-Way lapping process lunch and efficiency improve 30%. At same year get promotion (E06).
Education
/11--/12: Tian Jin Financial & Economical University Master of Business Administration (MBA )
1984/09--1988/07: Beijing Science and Technology University Electrical Engineering And Automation Bachelor
Training
1996/02--Present:***********training center
6 Sigma, DAMIC, Project Management,
Language Skills
English VERY GOOD
篇4:生产营运经理的英文简历范本
full name:
sexual distinction: male
give unripe date: on july 4, 1965
occupy a dwelling place: tianjin city
working fixed number of year: 10 years of above
firewood of item the year before last year: 10 thousand rmbs of x x
address: in x of x of area of x of tianjin city x
expectation yearly salary: 10 thousand rmbs of x x x
email: @.cn of x of x of x of x x x
mobile telephone: x of x of x of x of x of x of 137 x x
ego evaluation
oneself are a job the active and serious and responsible, active, person that is good at group work, thinking is rigorous, have higher technical level and rich administrative experience. suit to be engaged in an electron / mechanical product production and quality are high management heads the work.
intent of to apply for a job
working property: full-time
hope industry: electronic technology / semiconductor, make (machinery / equipment) , communication / telegraphic (equipment, operation, appreciation serves)
target place: beijing, tianjin city
target function: produce battalion carry manager,
working experience
XX/09- - up to now: limited company of x x mechanical equipment
what belong to an industry: make (mechanical / equipment)
project of project government department is built / manager of manufacturing battalion carry
responsible corporation builds workshop project management, design / construction / invite public bidding is purchased, reach spot management final acceptable the job (12, workshop of 000 square metre) . be in charge of company quality at the same time / safety
1.生产营运经理英文简历模板
2.生产经理英文简历
3.生产经理的英文简历
4.制造业生产经理英文简历
5.英文简历(生产经理)PRODUCTION MANAGER
6.生产经理英文简历参考
7.生产经理英文简历范文
8.物流经理英文简历范本
9.办公室经理的英文简历范本
10.经理英文简历
篇5:生产营运经理简历
基 本 信 息
姓 名:曹*
性 别:男
出生日期:1965年07月04日
居 住 地:天津市
工作年限:十年以上
目前年薪:xx万人民币
地 址: 天津市xx区xx里
期望年薪:xxx万人民币
电子邮件:xxx@westrac.com.cn
移动电话:137xxx
自我评价
本人是一个工作认真负责、积极主动、善于团队工作的人,思维严谨,具有较高的技术水平和丰富的管理经验。适合从事电子/机械产品生产及质量高级管理领导工作。
求职意向
工作性质:全职
希望行业:电子技术/半导体,制造(机械/设备) ,通讯/电信(设备,运营,增值服务)
目标地点:北京市,天津市
篇6:生产营运经理简历
工作经验
/09--至今:**机械设备有限公司
所属行业: 制造(机械/设备)
项目管理部 项目建设/生产营运经理
负责公司新建厂房项目管理,设计/建设/招标采购,及现场管理及最终验收的工作(12,000平方米厂房)。同时负责公司质量/安全管理及厂务维修管理工作。负责公司塔灯组装线生产新业务从澳洲的转移及生产车间建立及生产管理工作(40名操作员工)年销售额为一千万美元。作为公司6-sigma 项目推广经理负责三位黑带的项目管理及培训工作对精义生产有一定实施经验。负责公司质量系统建立及ISO质量认证工作。
汇报对象:工厂总经理 ***
下属人数:40
工作业绩:被公司授予最佳员工。
/02--2003/09:摩托罗拉(天津)电子有限公司
所属行业: 电子技术/半导体
生产部 生产经理
1月--9月 摩托罗拉(天津)电子有限公司陶瓷滤波器厂。
作为MOTOROLA CPG 陶瓷滤波器厂生产经理,负责前段生产工序的生产线设备及工艺转移(美国),生产线安装调试及人员招募培训,质量系统及操作规程的建立。新产品及新制程的引进及大批量生产安排及培训。负责全线生产计划安排,产品质量控制,原辅料控制及成本控制。负责全线350操作员工(12 主管& 工程师)协调及管理。经过6年的生产实践对外资企业生产管理,质量系统的建立,电子产品工艺制程运行优化及陶瓷滤波器生产制造工艺及其在通信产品上应用 有较深入研究。负责新生产线产品客户认证及QSR 认证。负责公司陶瓷滤波器厂MRP-2系统,6-Sigma项目管理实施,参数设置,新技术推广等工作。生产计划制定,生产成本控制,人员效率提升及员工关系管理为主要日常工作。
2月-192月
摩托罗拉中国电子有限公司汽车电控部晶片厂
作为MOTOROLA CBM 晶片厂非抛光线高级主管及质量工程师负责非抛光线产品产量质量控制及4-臂研磨新技术的 引进及推广。新型晶片酸洗设备 的改进及制程优化工作。带领40名主管及操作员工圆满完成晶片厂生产任务受到总经理晋级奖励。
1994年1月--191月
天津钢管公司直接还原铁厂
作为电气项目主要负责工程师负责钢管公司直接还原铁项目电气仪表设备在还原铁厂数据采集设备的安装及调试。在英国DAVY International 公司参与为期3个月的电气仪表设备的详细设计联络工作。负责全厂电气仪表设备的备品备件日常管理工作。
1988年8月--1994年1月 天津钢管公司自动化部
作为中方主要现场调试负责工程师与意大利现场调试工程师一起负责220KV总降压变电站计算机监控系统(N-90 PLC)的设备安装及调试。并负责总降压变电站监控设备的 日常维护,应用培训及备品备件管理工作。作为电气工程师负责钢管公司炼钢厂电弧炉区域电气设备的安装调试及信号采集监控系统(DCS Net-90)设备的安装调试.于1991年6月-1991年12月在意大利ANSELDO 公司及Beily 公司进行为期6个月的炼钢厂 信号采集系统 Net-90 (DCS) 培训,并负责此区域电气设备的'备品备件的管理及日常维护工作。
摩托罗拉公司陶瓷滤波器厂:
汇报对象: ** 营运经理
下属人数: 350
证 明 人: **@CTSWireless.
工作业绩:
1. 完成蘸银前线设备的转移及新生产线的建立,设计产能的确达到400k/周超出目标产能30%。 通过新生产线产品的客户认证及新生产线MOTOROLA QSR认证。并完成6种产品的转移及4种新产品天津厂试生产及正式生产。 同年受到总经理的晋级奖励E08。
2.1997-1998与同事合作完成6-sigma 工艺改进项目LAP-3 到4-WAY 研磨机制程改变,人均产能提高30%。同期完成晶片升频酸洗设备的改进。产能提高20%。
教 育 经 历
1999/11--/12:**学院 工商管理 硕士
MBA 硕士学位毕业
1984/09--1988/07: **大学 电气工程及其自动化 本科
于1988年7月自动化系电气工程及自动化专业学士学位毕业。
语 言 能 力
英语 熟练
篇7:生产营运经理简历
姓 名:曹*
性 别:男
出生日期:1965年07月04日
居 住 地:天津市
工作年限:十年以上
目前年薪:** 万人民币
地 址: 天津市**区**里
期望年薪:***万人民币
电子邮件:******@westrac.com.cn
移动电话:137********
自 我 评 价
本人是一个工作认真负责、积极主动、善于团队工作的人,思维严谨,具有较高的技术水平和丰富的管理经验。适合从事电子/机械产品生产及质量高级管理领导工作。
求 职 意 向
工作性质:全职
希望行业:电子技术/半导体,制造(机械/设备) ,通讯/电信(设备,运营,增值服务)
目标地点:北京市,天津市
篇8:生产营运经理简历
工 作 经 验
/09--至今:**机械设备有限公司
所属行业: 制造(机械/设备)
项目管理部 项目建设/生产营运经理
负责公司新建厂房项目管理,设计/建设/招标采购,及现场管理及最终验收的工作(12,000平方米厂房)。同时负责公司质量/安全管理及厂务维修管理工作。负责公司塔灯组装线生产新业务从澳洲的转移及生产车间建立及生产管理工作(40名操作员工)年销售额为一千万美元。作为公司6-sigma 项目推广经理负责三位黑带的项目管理及培训工作对精义生产有一定实施经验。负责公司质量系统建立及ISO质量认证工作。
汇报对象:工厂总经理 ***
下属人数:40
工作业绩:被公司授予最佳员工。
/02--2003/09:摩托罗拉(天津)电子有限公司
所属行业: 电子技术/半导体
生产部 生产经理
1月--9月 摩托罗拉(天津)电子有限公司陶瓷滤波器厂。
作为MOTOROLA CPG 陶瓷滤波器厂生产经理,负责前段生产工序的生产线设备及工艺转移(美国),生产线安装调试及人员招募培训,质量系统及操作规程的建立。新产品及新制程的引进及大批量生产安排及培训。负责全线生产计划安排,产品质量控制,原辅料控制及成本控制。负责全线350操作员工(12 主管& 工程师)协调及管理。经过6年的生产实践对外资企业生产管理,质量系统的建立,电子产品工艺制程运行优化及陶瓷滤波器生产制造工艺及其在通信产品上应用 有较深入研究。负责新生产线产品客户认证及QSR 认证。负责公司陶瓷滤波器厂MRP-2系统,6-Sigma项目管理实施,参数设置,新技术推广等工作。生产计划制定,生产成本控制,人员效率提升及员工关系管理为主要日常工作。
2月-192月
摩托罗拉中国电子有限公司汽车电控部晶片厂
作为MOTOROLA CBM 晶片厂非抛光线高级主管及质量工程师负责非抛光线产品产量质量控制及4-臂研磨新技术的 引进及推广。新型晶片酸洗设备 的改进及制程优化工作。带领40名主管及操作员工圆满完成晶片厂生产任务受到总经理晋级奖励。
1994年1月--191月
天津钢管公司直接还原铁厂
作为电气项目主要负责工程师负责钢管公司直接还原铁项目电气仪表设备在还原铁厂数据采集设备的安装及调试。在英国DAVY International 公司参与为期3个月的电气仪表设备的详细设计联络工作。负责全厂电气仪表设备的备品备件日常管理工作。
1988年8月--1994年1月 天津钢管公司自动化部
作为中方主要现场调试负责工程师与意大利现场调试工程师一起负责220KV总降压变电站计算机监控系统(N-90 PLC)的设备安装及调试。并负责总降压变电站监控设备的 日常维护,应用培训及备品备件管理工作。作为电气工程师负责钢管公司炼钢厂电弧炉区域电气设备的安装调试及信号采集监控系统(DCS Net-90)设备的`安装调试.于1991年6月-1991年12月在意大利ANSELDO 公司及Beily 公司进行为期6个月的炼钢厂 信号采集系统 Net-90 (DCS) 培训,并负责此区域电气设备的备品备件的管理及日常维护工作。
摩托罗拉公司陶瓷滤波器厂:
汇报对象: ** 营运经理
下属人数: 350
证 明 人: **@CTSWireless.
工作业绩:
1. 完成蘸银前线设备的转移及新生产线的建立,设计产能的确达到400k/周超出目标产能30%。 通过新生产线产品的客户认证及新生产线MOTOROLA QSR认证。并完成6种产品的转移及4种新产品天津厂试生产及正式生产。 同年受到总经理的晋级奖励E08。
2.1997-1998与同事合作完成6-sigma 工艺改进项目LAP-3 到4-WAY 研磨机制程改变,人均产能提高30%。同期完成晶片升频酸洗设备的改进。产能提高20%。
教 育 经 历
1999/11--/12:**学院 工商管理 硕士
MBA 硕士学位毕业
1984/09--1988/07: **大学 电气工程及其自动化 本科
于1988年7月自动化系电气工程及自动化专业学士学位毕业。
语 言 能 力
英语 熟练
篇9:英文简历生产经理
英文简历(生产经理)
BACKGROUND SUMMARYExtensive and diversified supervisory experience in computer,office furniture,and boat manufacturing operations.Particularly effective in increasing productivity and capavcity.Demonstrated ability to learn new skills quickly.Able to supervise new departments without prior experience and meet production goals.Successfuily motivate employees.Excellent interpersonal skills.Gained reputation for honesty and placed in a position of trust.
SUMMARY OF ACCOMPLISHMENTS
Supervised the start-up of second shift shipping department.Trained new employees,reached full capacity while maintaining quality and production goals.
Instructed Quality Development courses.
Participated in upgrading assembly systems at Lennon and Epstein Systems.
Consistently met and/or surpassed production goals.Supervised same day shipping of orders.
Participated with Lennon management team in the move of logistics,service operations from St.Paui to Winona facility.Received cash achievement award for this project.
Operated computerized warehouse management,inventory control and order processing systems.
Researched requirements and supervised the development of a high-tech paint laboratory including procurement and staffing.
Planned,arranged and supervised rework groups which traveled to on-site locations to perform engineering repairs and other problem-solving activities.
Supervised development of new preassembled components of cabin cruisers at Howell Boat Company.
Consistently built and maintained strong relationships with vendors and customers through close and effective communication.
Supervised,scheduled and coordinated production of four departments in a metal fabrication operation.
Notice:
Since candidate has held six jobs as production supervisor,he/she chooses not to repeat same job description six times.
Instead,candidate summarizes work history under“Summary of Accomplishments”.
篇10:生产经理英文简历
生产经理英文简历
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
CAREER OBJECTIVE
Efficient supervisor seeks a team leader position to help increase productivity and meet or exceed company goals.
BACKGROUND SUMMARY
Extensive and diversified supervisory experience in computer,office furniture,and boat manufacturing operations.Particularly effective in increasing productivity and capavcity.Demonstrated ability to learn new skills quickly.Able to supervise new departments without prior experience and meet production goals.Successfuily motivate employees.Excellent interpersonal skills.Gained reputation for honesty and placed in a position of trust.
SUMMARY OF ACCOMPLISHMENTS
Supervised the start-up of second shift shipping department.Trained new employees,reached full capacity while maintaining quality and production goals.
Instructed Quality Development courses.
Participated in upgrading assembly systems at Lennon and Epstein Systems.
Consistently met and/or surpassed production goals.Supervised same day shipping of orders.
Participated with Lennon management team in the move of logistics,service operations from St.Paui to Winona facility.Received cash achievement award for this project.
Operated computerized warehouse management,inventory control and order processing systems.
Researched requirements and supervised the development of a high-tech paint laboratory including procurement and staffing.
Planned,arranged and supervised rework groups which traveled to on-site locations to perform engineering repairs and other problem-solving activities.
Supervised development of new preassembled components of cabin cruisers at Howell Boat Company.
Consistently built and maintained strong relationships with vendors and customers through close and effective communication.
Supervised,scheduled and coordinated production of four departments in a metal fabrication operation.
Notice:
Since candidate has held six jobs as production supervisor,he/she chooses not to repeat same job description six times.
Instead,candidate summarizes work history under“Summary of Accomplishments”.
篇11:生产经理英文简历
生产经理英文简历
PRODUCTION MANAGER
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
CAREER OBJECTIVE
Efficient supervisor seeks a team leader position to help increase productivity and meet or exceed company goals.
BACKGROUND SUMMARY
Extensive and diversified supervisory experience in computer,office furniture,and boat manufacturing operations.Particularly effective in increasing productivity and capavcity.Demonstrated ability to learn new skills quickly.Able to supervise new departments without prior experience and meet production goals.Successfuily motivate employees.Excellent interpersonal skills.Gained reputation for honesty and placed in a position of trust.
SUMMARY OF ACCOMPLISHMENTS
Supervised the start-up of second shift shipping department.Trained new employees,reached full capacity while maintaining quality and production goals.
Instructed Quality Development courses.
Participated in upgrading assembly systems at Lennon and Epstein Systems.
Consistently met and/or surpassed production goals.Supervised same day shipping of orders.
Participated with Lennon management team in the move of logistics,service operations from St.Paui to Winona facility.Received cash achievement award for this project.
Operated computerized warehouse management,inventory control and order processing systems.
Researched requirements and supervised the development of a high-tech paint laboratory including procurement and staffing.
Planned,arranged and supervised rework groups which traveled to on-site locations to perform engineering repairs and other problem-solving activities.
篇12:生产经理英文简历
生产经理英文简历模板
PRODUCTION MANAGER
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING。
CAREER OBJECTIVE
Efficient supervisor seeks a team leader position to help increase productivity and meet or exceed company goals。
BACKGROUND SUMMARY
Extensive and diversified supervisory experience in computer,office furniture,and boat manufacturing operations。Particularly effective in increasing productivity and capavcity。Demonstrated ability to learn new skills quickly。Able to supervise new departments without prior experience and meet production goals。Successfuily motivate employees。Excellent interpersonal skills。Gained reputation for honesty and placed in a position of trust。
SUMMARY OF ACCOMPLISHMENTS
Supervised the start-up of second shift shipping department。Trained new employees,reached full capacity while maintaining quality and production goals。
Instructed Quality Development courses。
Participated in upgrading assembly systems at Lennon and Epstein Systems。
Consistently met and/or surpassed production goals。Supervised same day shipping of orders。
Participated with Lennon management team in the move of logistics,service operations from St。Paui to Winona facility。Received cash achievement award for this project。
Operated computerized warehouse management,inventory control and order processing systems。
Researched requirements and supervised the development of a high-tech paint laboratory including procurement and staffing。
Planned,arranged and supervised rework groups which traveled to on-site locations to perform engineering repairs and other problem-solving activities。
Supervised development of new preassembled components of cabin cruisers at Howell Boat Company。
Consistently built and maintained strong relationships with vendors and customers through close and effective communication。
Supervised,scheduled and coordinated production of four departments in a metal fabrication operation。
Notice:
Since candidate has held six jobs as production supervisor,he/she chooses not to repeat same job description six times。
Instead,candidate summarizes work history under“Summary of Accomplishments“。
篇13:生产经理英文简历
15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
CAREER OBJECTIVE
Efficient supervisor seeks a team leader position to help increase productivity and meet or exceed company goals.
BACKGROUND SUMMARY
Extensive and diversified supervisory experience in computer,office furniture,and boat manufacturing operations.Particularly effective in increasing productivity and capavcity.Demonstrated ability to learn new skills quickly.Able to supervise new departments without prior experience and meet production goals.Successfuily motivate employees.Excellent interpersonal skills.Gained reputation for honesty and placed in a position of trust.
SUMMARY OF ACCOMPLISHMENTS
Supervised the start-up of second shift shipping department.Trained new employees,reached full capacity while maintaining quality and production goals.
Instructed Quality Development courses.
Participated in upgrading assembly systems at Lennon and Epstein Systems.
Consistently met and/or surpassed production goals.Supervised same day shipping of orders.
Participated with Lennon management team in the move of logistics,service operations from St.Paui to Winona facility.Received cash achievement award for this project.
Operated computerized warehouse management,inventory control and order processing systems.
Researched requirements and supervised the development of a high-tech paint laboratory including procurement and staffing.
Planned,arranged and supervised rework groups which traveled to on-site locations to perform engineering repairs and other problem-solving activities.
Supervised development of new preassembled components of cabin cruisers at Howell Boat Company.
Consistently built and maintained strong relationships with vendors and customers through close and effective communication.
Supervised,scheduled and coordinated production of four departments in a metal fabrication operation.
Notice:
Since candidate has held six jobs as production supervisor,he/she chooses not to repeat same job description six times.
Instead,candidate summarizes work history under“Summary of Accomplishments”.
篇14:生产经理英文简历
Name: Mr. G Gender: Male
Wedlock: Married Nation: Han
Residence: Guangdong-Shenzhen Age: 33
Location: Guangdong-Shenzhen Height: 175cm
Target Locations: Guangdong-Shenzhen、Guangdong-Dongguan、Guangdong-Guangzhou
Target Positions: Industry/Factories-Product Manager
Management-Project Manager
Management-Branch Manager/Director
Target Jobs: production manager、project manager
Desired Salary: Negotiable
When Can Start: within 01 month
Education
-09 ~ -07 Henan industy university oil and fat industry Bachelor Degree
Training
-03 ~ 2011-03 Flextronics’ GBE Lean /Green belt Green belt
-07 ~ 2008-07 internal training, Solectron Lean
-01 ~ 2007-01 www.chinaCEOt.com How to improve leadership of factory
-08 ~ 2005-08 internal training, Solectron 6 Sigma/Lean
【company name】 (2008-08 ~ Present)
Company Type: Foreign Enterprise Company Category: Electrical,Micro-electronics
Job Title: production manager Positions: Product Manager
Job Description: ?Report to Operation Director in SJ factory from August 2008 to October 2011
?Responsible for the whole production department, total 10 workshops and more than 4000 operators, and include material management and production training
?Responsible for all budge and cost of production.
?Responsible for many important index, Output and Revenue, Efficiency, DL&IDL cost, Yield and FQA pass rate, EDM, Scrap etc
?Lead the kaizen, improve the productivity and yield and the other index
?Report to Operation Director in XX/DG factory from October 2011 to now
?As the leader, responsible for setting up the new workshop to transfer the project from XX to DG factory in
?Now is in charge of the Apple product in DG factory
【company name】 (2005-08 ~ 2008-08)
Company Type: Foreign Enterprise Company Category: Electrical,Micro-electronics
Job Title: Sr. supervisor Positions: Operations Manager/Director
Job Description: ?Report to the production manager
?I am in charge of the Pace project’s production, about 500 operators. The project is defined by customer, include all the process, SMT, Manual Insert, Automatic Insert, Final Assembly, and the BGA rework process, etc.
?Responsible for all production management, responsible for Efficiency and Yield, Scrap and the other index
?As the important team member and the backup of the CFT(customer focus team),give the team leader(PM) full support
【company name】 (2002-07 ~ 2005-08)
Company Type: Foreign Enterprise Company Category: Electrical,Micro-electronics
Job Title: supervisor Positions: Operations Manager/Director
Job Description: ?Report to Production Manager
?The company is a Korea company, the product include earphone, remote device and microphone, the customer is some famous companies, such as Samsung, LG, Huawei, etc.
?Responsible for the whole production department, include planning, production management, equipment and machine management, making the work instruction, training the new operators,etc
Project Experience
transfer XX project to DG factory (2012-02 ~ 2012-08)
Job Title: Leader(Production Manager)
Project Description: Transfer the whole XX factory to DG factory.transfer the machine and some staff to DG factory, but need hire all the new operators in DG factory. Now there are about operators in XX project.
Responsibility: set up the new workshop,hire the new operators and train them,in charge of the whole operation
Special Skills
Professional Title:
Computer Level: senior non-computer-specialty grade 2
Computer Skills: can well use all sorts of computer software,Excel,Word,AutoCAD,Photoshop etc
Strengths: 8 years production management experience, the much experience come from the famous foreign enterprise, have been trained about the knowledge of Learn,6 Sigma, Green Belt. Very familiar with the big foreign enterprise’s system, process and culture.
Language Skills
Chinese: Good Cantonese: Very Bad
English Level: CET-4 Spoken General
English: Good
Career Objective
Career Direction: become a occupational manager
Requirements:
Self Info.
Self Assessment: ?Almost 11 years production management experience, the much experience come from the famous foreign enterprise, Have been trained about the knowledge of Lean,6 Sigma, Green Belt. Very familiar with the big foreign enterprise’s system, process and culture.
?Very open field of view and good control ability, good communication,I am amicable, ambitious, cooperative and dedicated, can work under tremendous pressure
Hobbies: ?Playing basketball, Music, Travel
Rewards
get the top three of kaizen competition 2012-12-30
Certifications
Lean green belt 2011-08-10
篇15:英文简历生产经理
BACKGROUND SUMMARY
Extensive and diversified supervisory experience in computer,office furniture,and boat manufacturing operations.Particularly effective in increasing productivity and capavcity.Demonstrated ability to learn new skills quickly.Able to supervise new departments without prior experience and meet production goals.Successfuily motivate employees.Excellent interpersonal skills.Gained reputation for honesty and placed in a position of trust.
SUMMARY OF ACCOMPLISHMENTS
Supervised the start-up of second shift shipping department.Trained new employees,reached full capacity while maintaining quality and production goals.
Instructed Quality Development courses.
Participated in upgrading assembly systems at Lennon and Epstein Systems.
Consistently met and/or surpassed production goals.Supervised same day shipping of orders.
Participated with Lennon management team in the move of logistics,service operations from St.Paui to Winona facility.Received cash achievement award for this project.
Operated computerized warehouse management,inventory control and order processing systems.
Researched requirements and supervised the development of a high-tech paint laboratory including procurement and staffing.
Planned,arranged and supervised rework groups which traveled to on-site locations to perform engineering repairs and other problem-solving activities.
Supervised development of new preassembled components of cabin cruisers at Howell Boat Company.
Consistently built and maintained strong relationships with vendors and customers through close and effective communication.
Supervised,scheduled and coordinated production of four departments in a metal fabrication operation.
Notice:
Since candidate has held six jobs as production supervisor,he/she chooses not to repeat same job description six times.
Instead,candidate summarizes work history under“Summary of Accomplishments”.
篇16:生产营运经理简历中文版
姓 名:曹**
性 别:男
出生日期:1965年07月04日
居 住 地:天津市
工作年限:十年以上
目前年薪:**万人民币
地 址: 天津市**区**里
期望年薪:***万人民币
电子邮件:******@westrac.com.cn
移动电话:137********
求 职 意 向
工作性质:全职
希望行业:电子技术/半导体,制造(机械/设备) ,通讯/电信(设备,运营,增值服务)
目标地点:北京市,天津市
篇17:生产营运经理简历中文版
工 作 经 验
/09--至今:**机械设备有限公司
所属行业: 制造(机械/设备)
项目管理部 项目建设/生产营运经理
负责公司新建厂房项目管理,设计/建设/招标采购,及现场管理及
最终验收的工作(12,000平方米厂房)。同时负责公司质量/安全管理及厂务维修管理工作。负责公司塔灯组装线生产新业务从澳洲的转移及生产车间建立及生产管理工作(40名操作员工)年销售额为一千万美元。作为公司6-sigma 项目推广经理负责三位黑带的项目管理及培训工作对精义生产有一定实施经验。负责公司质量系统建立及iso质量认证工作。汇报对象:工厂总经理***
下属人数:40
工作业绩:被公司授予最佳员工。
/02--2003/09:摩托罗拉(天津)电子有限公司
所属行业: 电子技术/半导体
生产部 生产经理
1月--9月 摩托罗拉(天津)电子有限公司陶瓷滤波器厂。
作为motorola cpg 陶瓷滤波器厂生产经理,负责前段生产工序的生产线设备及工艺转移(美国),生产线安装调试及人员招募培训,质量系统及操作规程的建立。新产品及新制程的引进及大批量生产安排及培训。负责全线生产计划安排,产品质量控制,原辅料控制及成本控制。负责全线350操作员工(12 主管& 工程师)协调及管理。经过6年的生产实践对外资企业生产管理,质量系统的建立,电子产品工艺制程运行优化及陶瓷滤波器生产制造工艺及其在通信产品上应用 有较深入研究。负责新生产线产品客户认证及qsr 认证。负责公司陶瓷滤波器厂mrp-2系统,6-sigma项目管理实施,参数设置,新技术推广等工作。生产计划制定,生产成本控制,人员效率提升及员工关系管理为主要日常工作。
2月-192月 摩托罗拉中国电子有限公司汽车电控部晶片厂
作为motorola cbm 晶片厂非抛光线高级主管及质量工程师负责非抛光线产品产量质量控制及4-臂研磨新技术的 引进及推广。新型晶片酸洗设备 的改进及制程优化工作。带领40名主管及操作员工圆满完成晶片厂生产任务受到总经理晋级奖励。
1994年1月--191月 天津钢管公司直接还原铁厂
作为电气项目主要负责工程师负责钢管公司直接还原铁项目电气仪表设备在还原铁厂数据采集设备的安装及调试。在英国davy international 公司参与为期3个月的电气仪表设备的详细设计联络工作。负责全厂电气仪表设备的备品备件日常管理工作。
1988年8月--1994年1月 天津钢管公司自动化部
作为中方主要现场调试负责工程师与意大利现场调试工程师一起负责220kv总降压变电站计算机监控系统(n-90 plc)的设备安装及调试。并负责总降压变电站监控设备的' 日常维护,应用培训及备品备件管理工作。作为电气工程师负责钢管公司炼钢厂电弧炉区域电气设备的安装调试及信号采集监控系统(dcs net-90)设备的安装调试.于1991年6月-1991年12月在意大利anseldo 公司及beily 公司进行为期6个月的炼钢厂 信号采集系统 net-90 (dcs) 培训,并负责此区域电气设备的备品备件的管理及日常维护工作。
摩托罗拉公司陶瓷滤波器厂:
汇报对象: **运经理
下属人数: 350
证 明 人: **@ctswireless.
工作业绩:
1. 完成蘸银前线设备的转移及新生产线的建立,设计产能的确达到400k/周超出目标产能30%。 通过新生产线产品的客户认证及新生产线motorola qsr认证。并完成6种产品的转移及4种新产品天津厂试生产及正式生产。 同年受到总经理的晋级奖励e08。
2.-与同事合作完成6-sigma 工艺改进项目lap-3到4-way研磨机制程改变,人均产能提高30%。同期完成晶片升频酸洗设备的改进。产能提高20%。
教 育 经 历
1999/11--/12:**学院 工商管理 硕士 mba 硕士学位毕业
1984/09--1988/07: **大学 电气工程及其自动化 本科
于1988年7月自动化系电气工程及自动化专业学士学位毕业。
语 言 能 力
英语 熟练
自 我 评 价
本人是一个工作认真负责、积极主动、善于团队工作的人,思维严谨,具有较高的技术水平和丰富的管理经验。适合从事电子/机械产品生产及质量高级管理领导工作。
篇18:生产营运经理求职简历
生产营运经理求职简历模板
基本信息
姓名:曹*
性别:男
出生日期:1965年07月04日
居住地:天津市
工作年限:十年以上
目前年薪:**万人民币
地址:天津市**区**里
期望年薪:***万人民币
电子邮件:
移动电话:137********
自我评价
本人是一个工作认真负责、积极主动、善于团队工作的人,思维严谨,具有较高的技术水平和丰富的'管理经验。适合从事电子/机械产品生产及质量高级管理领导工作。
求职意向
工作性质:全职
希望行业:电子技术/半导体,制造(机械/设备),通讯/电信(设备,运营,增值服务)
目标地点:北京市,天津市
目标职能:生产营运经理,
工作经验
2003/09--至今:**机械设备有限公司
所属行业:制造(机械/设备)
项目管理部项目建设/生产营运经理
负责公司新建厂房项目管理,设计/建设/招标采购,及现场管理及最终验收的工作(12,000平方米厂房)。同时负责公司质量/安全管理及厂务维修管理工作。负责公司塔灯组装线生产新业务从澳洲的转移及生产车间建立及生产管理工作(40名操作员工)年销售额为一千万美元。作为公司6-sigma项目推广经理负责三位黑带的项目管理及培训工作对精义生产有一定实施经验。负责公司质量系统建立及ISO质量认证工作。
汇报对象:工厂总经理***
下属人数:40
工作业绩:20被公司授予最佳员工。
1996/02--2003/09:摩托罗拉(天津)电子有限公司
所属行业:电子技术/半导体
生产部生产经理
1998年1月--209月摩托罗拉(天津)电子有限公司陶瓷滤波器厂。
作为MOTOROLACPG陶瓷滤波器厂生产经理,负责前段生产工序的生产线设备及工艺转移(美国),生产线安装调试及人员招募培训,质量系统及操作规程的建立。新产品及新制程的引进及大批量生产安排及培训。负责全线生产计划安排,产品质量控制,原辅料控制及成本控制。负责全线350操作员工(12主管&工程师)协调及管理。经过6年的生产实践对外资企业生产管理,质量系统的建立,电子产品工艺制程运行优化及陶瓷滤波器生产制造工艺及其在通信产品上应用有较深入研究。负责新生产线产品客户认证及QSR认证。负责公司陶瓷滤波器厂MRP-2系统,6-Sigma项目管理实施,参数设置,新技术推广等工作。生产计划制定,生产成本控制,人员效率提升及员工关系管理为主要日常工作。
篇19:生产营运经理简历中文版
工 作 经 验
2003/09--至今:**机械设备有限公司
所属行业: 制造(机械/设备)
项目管理部 项目建设/生产营运经理
负责公司新建厂房项目管理,设计/建设/招标采购,及现场管理及
【生产营运经理的英文简历范本】相关文章:
1.营运经理简历
6.运营经理英文简历
10.营运经理应聘求职简历






文档为doc格式