个人承包施工合同
“一天三顿小火锅”通过精心收集,向本站投稿了11篇个人承包施工合同,下面是小编为大家推荐的个人承包施工合同,欢迎大家分享。
篇1:钢筋工个人承包施工合同
钢筋工个人承包施工合同
合同编号: Contract Number
发 包 方: Employer
承 包 方: Contractor
签订时间: Date of Signature
签订地点: Place of Signature
第一条 工程设计技术条件 Article One Technical Conditions of Project Design
第二条 工程承包范围 Scope of Construction
第三条 工程造价 Article Project Cost
第四条 工程设计 Article Four Project Design
第五条 工地代表责任 Article Five Responsibilities of Site Representative
第六条 施工准备 Article Six Execution Preparation
第七条 工程期限 Article Seven Project Term
第八条 工程质量 Article Eight Project Quality
第九条 钢结构材料的供应、 验收 Article Nine Provision / Acceptance of Steel Materials
第十条 工程价款的支付与结算 Article Ten Payment and Settlement of Project Cost
第十一条 施工与设计变更 Article Eleven Alteration of Execution and Design
第十二条 工程验收 Article Twelve Acceptance of Project
第十三条 违约责任 Article Thirteen Responsibilities for Breach
第十四条 纠纷解决办法 Dispute Settlement
第十五条 附则 Article Fifteen Miscellaneous
根据 《建筑法》 规定,为明确双方在履行工程承包合同过程中的权利、义务、程序,经双方协商后,一致同意签订本合同,并依照履行。
For the purpose of stipulation of tittles, liabilities and procedure of project execution hereof for parties hereto, this contract is, through mutual negotiation and agreement by parties hereto, made and entered into for their fulfillment.
第一条 工程设计技术条件 Article One Technical Conditions of Project Design
? 工程名称: Project Name
? 工程地点: Place of Project
? 工程范围及技术要求(本条款内容可作为合同附件列载)
Scope and Technical Requirement of Project (The contents of this clause may be stipulated as Annex hereof).
1 、地质资料由 ___ 提供给设计方
Geographic materials shall be submitted by to the design party.
2 、钢结构建筑抗震等级 Seismic rating of steel structure
3 、建筑设计规格及要求 Specification and requirement of structure design
第二条 工程承包范围 Scope of Construction
一、± 0.000 以上建筑钢结构部分及屋面、墙面(不含砌体和混凝土),详见第一条相关的内容和最终报价书的报价范围。
Steel structure above ± 0.000, roof and walls ( excluding masonry and concrete), which as detailed the contents and final quotation related to Article One.
二、钢结构原辅材料采购、制造、运输、安装及按现行国家法规应由承包方支付的费用,及发包方委托的钢结构施工图设计。
Procurement, manufacture, transportation and installment of raw / auxiliary materials for steel structure and the cost which should be effected payment by contractor as per existing State’s laws and regulations, and drawings design of project which commissioned by employer.
三、本工程钢结构建筑面积: _______ (平方米)
Construction area of this project is square meters.
四、本工程运输由 ______ 方负责,运费 _____ 在本合同造价内。
Transportation of project shall be liability of , freight of transportation including the project cost herein.
五、本工程基础设计由 ________ 方负责,基础施工由发包方负责并承担费用。
Foundation design shall be liability of , the fees and cost of foundation execution shall be liability of employer and at employer’s cost.
第三条 工程造价 Article Project Cost
工程总造价:人民币 ______ 万元; Total cost of project: RMB YUAN ;
开具发票:材料、制作费 _______ 万元,技术服务及安装费 _______ 万元。
Invoice: The cost of materials and manufacture is RMB YUAN ;
The cost of technical service and installment is RMB YUAN ;
第四条 工程设计 Article Four Project Design
? 发包方责任 Employer’s Responsibilities
1 、发包方负责本工程基础土建的设计。
Design of civil work of project foundation shall be on employer.
2 、发包方委托承包方承担钢结构部分的设计,发包方提供设计所需要的工艺条件及技术条件(详见第一条工程技术条件)并在本合同生效后三天内提供全部相关的技术条件和工艺条件,以供承包方进行设计。
Employer shall commission contractor to assume the design of steel structure, for which employer provide the conditions of craftwork and technique which are necessary to design (dialed reference made to TECHNICAL CONDITIONS OF PROJECT of Article One), in addition to the provisions of all technical conditions and craftworks conditions, within three days upon validity of this contract for contractor’s design.
? 承包方责任 Contractor’s Responsibilities
1 、承包方必须按现行国家钢结构相关规范和发包方提供的相关资料及技术条件进行设计,发包方的超规范要求必须书面告之,承包方在国家规范允许的范围内给予适当倾向量。
Contractor should procethe design in accordance with State’s relevant norms of steel structure and respected materials and technical conditions, if and to the extent that any requirement by employer beyond state’s norms should be given the prior notice to contractor which may make appropriate amount of tendency within allowable arrange of State’s norms.
2 、基础图由承包方设计,发包方提供全部相关资料及技术条件后 ___ 天内,由承包方提供有资质设计院图签的土建基础施工图 套。
Foundation drawings shall be designed by contractor which should, after days of employer’s provision of all relevant materials and technical conditions, provide sets of foundation drawings of civil construction , which have been approved / signed by the qualified Design Institute , to employer.
第五条 工地代表责任 Article Five Responsibilities of Site Representative
? 发包方驻工地代表 Employer’s site representative
1 、发包方任命的驻工地代表及其委托代理人由具体管理人员担任,并代表发包方签发有关工程联系单、验收单、结算付款单等。经该代表签署的所有单据具有法律效力,但与本合同条款相冲突的签单无效,以本合同条款为准。
The duties of site representative appointed by and deputy of party A will be assumed by specific managers who shall issue, by or on behalf of employer, relevant Project Connecting Letter, Acceptance Notice and Settlement / Payment Notice, and so on. All documents which issued by such representative shall be in full force and effect, provided that any signed statement by representative conflict to the stipulations hereof shall be null and void, the terms hereof shall prevail.
2 、发包方代表或委托代理人的指令、联系单、通知、须经其本人签名,并以书面形式递交承包方代表,承包方代表在回执上签署姓名、时间后方生效。
No any direction, connecting letter and notice, which are given by site representative appointed by and deputy of party A, shall come into force and effect until have been made the signature of the representative thereon and submit in writing to contractor’s representative who sign its name on return receipt thereof.
第六条 施工准备 Article Six Execution Preparation
? 承包方 By Contractor
1 、在本合同生效后 ______ 日内,由承包方向发包方提供设计图纸 ______ 套,并通知发包方组织设计会审和施工图交底会议,会后 ______ 日内,由发包方提出修改决定,交承包方修改设计,如有设计变更的,则工期视变更情况作相应调整,增减的工程量按报价单计算作相应调整并另签补充合同。
Contractor will, within days after contract coming into force and effect, submit sets of design drawings to employer and a notice for the meeting of joint exam on design and execution drawings. Within days after the meeting, employer shall issue its amendment decision for contractor’s amendment of design. If and to the extension that modification or variation of design made, extension of execution time shall be adjusted correspondingly as the case may be, and all added or minus quantity shall, calculating on Statement of Quotation, be adjusted in addition to complementary contract herewith.
3 、组织原材料采购制造加工,组织施工管理人员和施工机械进常
Organization of the procurement, manufacture and processing, as well as organization of execution managers and machinery acceto the site.
4 、编制施工组织设计或施工方案,材料成品、半成品等进场计划(包括用水、用电计划)送发包方。
Preparation of Design or program of execution, Plan of entering site of material / semi-finished article (including plan of water, electricity supply ) shall be made and submitted to employer.
? 发包方 Employer
1 、合同约定委托承包方设计的项目,在本合同签订的同时,由发包方提供本合同规定的资料及技术条件,供承包方设计,在设计完成后有义务书面确认设计。
With respect to the design item done by contractor commissioned by contract stipulation, employer should, at the same time of this contract conclusion, supply the material and technical conditions, which are stipulated hereby, to contractor for the necessity to design, and have the responsibility of written confirmation on the finished design by contractor.
2 、在承包方进场前做好本工程符合钢结构安装要求的混凝土基础及预埋螺栓并验收合格,同时提供全套土建竣工资料及发包方验收数据的结论。
Employer should, before contractor enter into the site, complete concrete foundation and embedded bolt for this project, which meet the requirements for installation of steel structure, and through acceptance, at same time submit a full set of documents on completion of civil engineering project , and conclusion of data information from employer acceptance.
3 、在承包方进场前,保证本工程施工所需各类车辆进出道路的畅通,接通施工现场的施工用水及照明和动力电源(包括水表、配电板、电表)。
Employer should, before contractor enter into site, ensure the road on which all types of vehicles necessary for project execution smooth and free; and make connection of supply of , on site, water for execution and electricity for lighting and power (including water meter, power distribution panel and power meter).
4 、开工前办理建筑许可证等。如因无建筑许可证而发生的相关责任和一切费用由发包方承担。
Employer should, prior to commencement, procewith Construction Licence and other permissions, if, in the absence of Construction Licence, any relevant responsibility and cost arising there from shall be taken by employer.
第七条 工程期限 Article Seven Project Term
一、本工程钢结构工期自合同签字发包方付达定金之日起 _____ 内完成。其中设计 ____ 天 , 制造 _____天 , 安装自进场起 _____ 天完工。
The project construction should be completed within days as of the date on which earnest money paid by employer making its signature on this contract. days of the construction term for design, days for manufacture and days for installation which calculated from the date on which enter into the site.
二、发包方基础工程完工后,在承包方进场前 ______ 天,发包方应向承包方交付土建验收资料,承包方确认施工现场符合施工要求后,由发包方发出进场通知书,进场安装时间以承包方收到进场通知书后第 ______天起计算。
Employer should, in days prior to contractor’s acceto site after completion of foundation project by employer, delivery the materials of acceptance on civil engineering, and issue Notice of Entering Site to contractor by which the execution site have been confirmed to satisfy the requirements of execution. The time of entering site for installation shall be calculated on and from the day after contractor receive Notice of Entering Site.
第八条 工程质量 Article Eight Project Quality
一、本工程质量要求达到国家相关规范合格标准。
The quality of this project is required to meet State’s respected norms and to reach the eligibility criteria.
二、承包方必须严格按照国家有关规范标准要求精心设计,按照施工图纸、施工说明文件进行施工,接受监理工程师及发包方派驻代表的监督。
Contractor should, in accordance with strictly State’s relevant norms and standards, well-designed and proceexecution as specified on the drawings and explanation for execution, and subject to the surveillance of supervision engineer / site representative on behalf of employer.
第九条 钢结构材料的供应、 验收 Article Nine Provision / Acceptance of Steel Materials
由承包方提供的主要原材料、标准件,必须按有关规定提供产品质量合格证或进行验收合格后方可用于工程。由发包方提供的主要原材料、标准件,也必须有产品质量合格证方可用于工程。钢构主体工程必须经发包方派驻代表检查、验收签章后,方可进行围护结构的安装。
The main raw materials and standard parts which are supplied by contractor should pursuant to relevant specification, be provided with the Product Quality Certification or acceptance before used to project. The main raw materials and standard parts which are supplied by employer are also with the Product Quality Certification before used to project. Steel main project should, after through the exam and acceptance with the signature / seal of employer’s site representative, be processed with the installation of retaining structure.
第十条 工程价款的支付与结算 Article Ten Payment and Settlement of Project Cost
工程价款的支付和结算,根据国家有关部门制定的工程价款结算办法 , 并结合钢结构建筑的特殊情况进行支付与结算。
Payment and settlement of project cost shall, in accordance with the regulations of engineering cost settlement stipulated by State’s authority concerned, and combined with the particular circumstances of steel project, be processed.
一、本工程钢梁、钢柱进场三日内,发包方支付合同总价的 20 %作为工程预付款,计人民币 ____ 万元,承包方开始安装。
Employer should, within three days upon the date of steel beams and steel columns entering into the site, make payment of 20% of total contract cost as project’s advance payment which equal to RMB YUANbefore contractor commence the installation.
二、安装竣工并验收合格后的七天内支付合同总价的 75 %,计人民币 _____ 万元,余款 5 %,计人民币______ 万元作为质保金留滞 , 质保期为一年 , 待质保期满后三日内付清全部质保金。
Employer shall, within seven days on and after installation completion and through acceptance, pay contractor 75% of total contract cost, valued sum of RMB YUAN , and remaining 5% which valued RMB YUAN as retention money withheld for one year of quality warranty, and full retention money shall be released within three days upon expire of warranty period.
三、如因发包方拖欠工程款而影响工程进度,造成承包方的停工,窝工损失的,应由发包方承担相关经济损失,对延误的`工期相应延长。
Provided that if employer’s failure of payment of project cost effect the project progreand result in loof contractor’s work suspension and slowdown, on which the responsibilities shall be born by employer and extension of project term for contractor.
四、本合同结算方式:银行即期汇票,结算币种为人民币。
Settlement by Bank Demand Draft, the currency of settlement is RMB.
第十一条 施工与设计变更 Article Eleven Alteration of Execution and Design
一、正式的设计施工图纸、说明和有关技术资料,作为施工的有效依据,开工前由发包方组织设计交底和各方会审,任何一方不得擅自修改。
Formal design drawings, interpretation and relevant technical materials are the effective basis of project execution, for which, prior to commencement, employer shall organize design discussion and joint review by the parties concerned, any party shall not make unilateral alteration.
二、施工中如发现设计的错误或严重不合理的地方,发现方应及时以书面形式通知对方,由提供设计图纸方及时会同有关设计单位研究确定修改意见或变更设计文件,承包方按修改或变更的设计文件进行施工。若因此导致增加费用则由责任方承担,并调整合同造价。
Provided that any discovery of error or substantial unreasonable item in design, the party which discover should in time give written notice to opposite party therewith, and the party by which the design drawings submitted should without undue delay, with concerned design institution, confirm revising opinion of or modification of design document. Contractor shall make execution in accordance with the modified design, and the added cost therefore, if any, shall be on the account of the party with obligation, and contract cost may be adjusted correspondingly.
第十二条 工程验收 Article Twelve Acceptance of Project
一、混凝土基础工程由发包方验收或监理验收合格后在发包方发出《进场开工通知》前交承包方复验。
Concrete foundation project shall, through acceptance of employer or supervision engineer, prior to issuing of Notice of Commencement by employer, delivered to contractor for retesting.
二、钢结构工程验收:按施工图及说明文件、国家现行钢结构工程标准进行验收,验收应在竣工通知发出后五天内开始,逾期不进行验收的,视为验收合格,不影响支付工程款。
Respect to steel structure project: Final acceptance should be made in accordance with drawings, interpretation files and the current national standard for steel structure. Acceptance should, within five days after issuing Completion Notice, be made, if, fail to do so, the project shall be deemed as acceptance and not effect the payment of project cost.
第十三条 违约责任 Article Thirteen Responsibilities for Breach
? 承包方责任: Contractor’s responsibility
一、工程质量不符合设计规定的,负责无偿修理。
Wherever project quality fails to meet the stipulations of design, contractor should make repair in free.
二、因承包方过错不能按合同规定的期限交付使用的,每天按工程总价的万分之五偿付逾期违约金。
Provided that contractor fail to deliver project to use due to the fault of contractor, overdue penalty shall be charged on each delay day by five ten thousandth of total contract cost.
? 发包方的责任: Employer’s responsibility
一、如果发包方不按合同规定拨付工程进度款,对延付金额按照每天万分之五的违约金偿付给承包方,并允许承包方停工,工期相应顺延。
Provided that employer fail to make progrepayment as per contract provisions, deferred amount due to contractor shall be charged with breach penalty by each delay day by five -ten thousandth of the amount payable and allow contractor ‘s suspension in addition to extension of project term accordingly.
二、工程经验收合格或未经验收提前使用后仍不支付工程款的,违约金按总造价每日万分之十支付违约金。
Should employer still refuse to make payment of project cost after through acceptance or advance use without acceptance, breach penalty shall be calculated by each day ten C ten thousandth of total project cost.
‘
第十四条 纠纷解决办法 Dispute Settlement
如果发生与本合同或其任何附件的效力、解释或执行有关的争议,双方首先应争取通过友好协商解决该争议,如果一方向另一方发出通知开始协商之后的__日内,该争议未以此方式解决,则任何一方可将该争议提交仲裁。
In the event any dispute arises in connection with the validity, interpretation, or implementation of this Contract or any of its annexes, the Parties shall attempt in the first instance to resolve such dispute through friendly consultations. If the dispute is not resolved in this manner within _____ days after the date on which one Party has served written notice on the other Party for the commencement of consultations, then either party may refer the dispute to arbitration.
第十五条 附则 Article Fifteen Miscellaneous
一、本合同一式 _______ 份 , 合同附件 _________ 份。甲已双方各执合同正本 ______ 份。与本工程合同有关的施工图纸、招标文件、投标书、中标通知书,履行本合同过程中双方现场代表签署的联系单、指令单、会议纪要等具有合同附件之法律效力。
This contract is make copies of original, with annex copies, parties hereto held
copies of original respectively. Whatever any executing drawings, bidding documents, tender letter, Notice of Acceptance, in addition to, during performance of contract, the contact list, instruction, meeting minutes which are signed by the representatives of parties hereto shall the same validity as contract annex.
二、本合同自双方代表签字,加盖双方公章或合同专用章后成立,收到定金后合同即生效;在工程竣工验收符合要求,保修期满,结算工程款支付完毕后合同终止。
This contract shall, on and from signature of the representatives of parties hereto, be made establishment and shall become effective upon receipt of deposit, and shall cease its validity on and after acceptance in conform with the requirements, expire of warranty period and full payment of project cost.
三、双方已于本合同首页所载日期通过其正式授权的代表签订本合同,以资证明。
IN WITNESS WHEREOF, each of the Parties hereto has caused this Contract to be executed by its duly authorized representative on the date first set forth above.
发包方:(盖章) Employer (Seal) 承包方:(盖章) Contractor (Seal)
法定代表人(签署): 法定代表人(签署):
Legal Representative ( Signature ) Legal Representative ( Signature )
技术附件:
Fixing and calibration of anchor bolt for steel structure
钢结构地脚螺栓的固定与校正技术要求
Location of anchor bolt is the first key in the steel construction of this engineering, and shall be specially take care. The location shall be in time and correct to avoid delaying the construction period. After give out axis and frame before installing the embedded parts, cooperate the installing personnel to carry out rechecking for two times when the installation fixing and concrete pouring almost are formed, and adjust the position and elevation to ensure no risk at all.
柱脚螺栓的的精确定位是本工程钢结构施工的第一重点,应特别予以注意。定位要求及时、准确,避免延误工期。在预埋件安装前给出轴线、边框位置后,还要再配合安装人员,在安装固定和砼浇筑即将成型时进行两次复核,及时调整位置、标高,保证万无一失。
The embedding works of anchor bolt parts are responsible by special personnel, set with a special team, included one foreman, one measurer, two welders, two bar placer, and two woodworkers, to be responsible for all embedding works and in charge by the foremen.
预埋件预留工作安排专人负责,设一个专门小组,包括 1 名工长、 1 名测量员、 2 名电焊工、 2 名钢筋工和 2 名木工,负责全部预埋工作,并由工长统一负责。
Anchor bolts shall be processed, piled up in classification, and marked as per the requirements in the drawing beforehand, and be transported to the embedded position in time when the construction reaches the position at where the parts are used.
预埋件提前按图纸要求加工,分类堆放,做好标志,施工到设置使用的部位时,及时运到预埋位置。
Position of anchor bolt is measured from the axis and bounced out the centralized croline by measurer as per the designed requirements, and is placed per the line in setting. Due to the corner iron bracket that fixes the bolt is suspended and leaves a distance from the bottom, shall extend the vertical corner iron up to the upper surface of foundation slab, or increase corner iron bracket to support the bracket of bolt. When positioning, all shall be measured from the axis and must not from the sideline of template to prevent the deflection of embedded parts resulted from the incorrect template position
预埋件位置由测量员按设计要求,从轴线引测,弹出中心十字线,设置时按线安放。由于固定螺栓的角铁支架悬空、不到底,应将竖向角铁加长到基础底板上表面,或增加角铁支架来支撑螺栓支架。定位时应当全部由轴线引测,不得由模板边线引测,防止因模板位置不准导致埋件偏移。
For ensuring the embedded parts fixed securely, may weld them on the structural reinforcement by welder (But shall pay attention to not damage the force carrying reinforcement) to fix its relative position with the template for preventing the inner contraction of embedded parts deflects from the template and embeds into the concrete during concrete pouring. All the uppers of embedded bolts must be drawn through by reinforcement, or steel tube, and corner iron, etc., to ensure them not moved during concrete pouring.
为保证埋件固定牢靠,可用焊机将其焊在结构钢筋上 ( 但应注意不得损伤受力钢筋 ) ,固定其与模板的相对位置,防止在砼浇筑时埋件内缩偏离模板而埋入砼中。预埋螺栓上部必须全部用钢筋或钢管、角铁等全部拉通,确保在砼浇筑过程中不位移。
After embedded, we shall carry out rechecking to ensure the specification and model of embedded parts correct, the embedded position accurate, fixing reliable, and convenient for using.
预埋好后应进行复测检验,保证埋件的规格、型号、正确,预埋位置准确,固定可靠,便于利用。
Construction of embedded parts shall be in tight cooperation with the construction of reinforcement engineering, arrange well the construction sequence, and construct alternately. The embedding works must not affect the construction progreof reinforcement and template engineering. When reinforce the embedded parts, may utilize the existing reinforcement framework, but must not affect the structural requirements of reinforcement engineering, and meanwhile the reinforcing method shall be tidy and beautiful as possible.
预埋件施工要和钢筋工程施工密切配合,安排好施工顺序,穿插施工,预埋工作不得影响钢筋、模板工程的施工进度,预埋件加固时,可利用现有的钢筋骨架,但不得影响钢筋工程的结构要求,同时加固方式力求整齐美观。
The anchor bolts shall be closed by tape, etc., after installed. During the concrete construction, the vibrating rod must not touch the embedded parts, and the embedding team shall follow up for inspection, if any displacement found, calibrate it in time.
柱脚螺栓安装好后,要用胶带等进行封闭保护。混凝土施工时,严禁振动棒碰触埋件,预埋小组要跟踪检查,发现位移及时校正。
Carry out second recheck when the poured concrete just form but still not harden, if any displacement found, must reposition it by adopting measures at once.
Carry out second recheck when the poured concrete just form but still not harden, if any displacement found, must reposition it by adopting measures at once for ensuring the correct position of embedded bolts.
砼浇筑刚成型尚未凝固时,进行第二遍复核,如发现有位移,必须立即采取措施进行复位,以确保预埋螺栓位置的正确。
上一篇:建设工程补充协议书范本 下一篇:没有了篇2:个人承包食堂合同
甲方
立合同双方 (以下简称)
乙方
甲方根据教育部教财14号文件“关于围绕服务教育教学,服务师生和人民群众生活需要,培养和发展教育市场体系”的要求,经甲乙双方协商一致,特订立本合同,具体条款如下:
一、甲方同意乙方承包学校食堂,承包期限为一年,即从______年____月____日至______年_____月_______日止。
二、全年承包金为____________元整,于合同签订时一次交清。承包期间乙方需向甲方交卫生保证金5000元;财产保证金5000元。承包期满未出现食物中毒、财产损坏、保证金全额退回给乙方。出现上述问题,视情节在保证金内扣除。并由乙方承担全部损失。
三、甲方要求乙方法定代表人到甲方食堂具体负责管理,乙方对此表示同意。
四、乙方在承包期间,必须确保校园整洁,遵章守法,维护学校名誉。
安等部门和学校的管理,做好“门前三包”及食堂周边的环境卫生工作,出现问题,造成严重后果,后果由乙方自负,且甲方有权单方面终止合同。
五、乙方承包期间,应多动脑筋,改善服务态度,提高服务质量。如出现服务态度差,不能保证正常的伙食供应,师生意见大,反映强烈,甲方有权采取应急措施,并单方面终止合同,且不退还承包金。
六、乙方为学校食堂卫生、防火、治安第一责任人,须服从甲方保卫、后勤、门卫及上级有关部门的监督。乙方必须自行做好安全防盗、防火工作,如发生失窃、火灾事故而造成的一切损失由乙方自负。乙方聘用外来食堂工作人员,必须服从学校按有关管理规定进行统一管理。
七、合同期满甲方组织重新招标,乙方若需继续承包,可在规定时间内向甲方提出书面申请,同等条件下,优先参加投标,若未中标,乙方必须在合同期满前5天无条件移交房屋及有关设备。如强行占房,甲方有权按原承包价双倍收取占用金,并且依法强制搬出。
八、甲方提供水、电源,费用由乙方按实际使用量与甲方总务处结算,超过三个月不结算费用,视为乙方违约。为确保用电安全,乙方不得私自乱接电器,超负荷用电。
九、乙方经营中必须严格执行《食品卫生法》的各项条款,并接受学校总务处、校医室的卫生检查监督,所有从业人员必须持有健康证方可上岗服务。
十、乙方一切债务与甲方无关。
十一、乙方必须自觉遵守投标承诺,服从甲方统一领导,遵守国家有关法规,遵守校规校纪,不得以任何理由向室外延伸服务;不得在校园内对外服务。
十二、承包期内,乙方不得擅自改变房屋结构和设备位置,如乙方确因经营需要,需征得甲方同意。承包期满,甲方将组织人员对房屋设备进行验收检查,如果损坏,必须修复或予以赔偿。
十三、乙方中途未经甲方同意,不得擅自转包或改变服务性质。若擅自变更经营者或改变服务性质,则视为乙方违约,甲方有权终止合同,且不承担因终止合同而造成的经济损失。
十四、承包人因故需终止合同,须提前20日向乙方提出书面申请,甲方同意后5日内必须撤离。
十五、本合同系甲、乙双方自愿签订,如一方违约,应支付另一方违约金壹万元整。
十六、本次招标的公告、招标须知和中标方投标书为本合同的附件与本合同具体同等效力。
十七、如遇不可抗拒的原因而导致房屋毁损,致使合同无法履行,本合同自行终止,双方不承担责任。
十八、本合同未尽事宜,一律按《中华人民共和国经济合同法》的有关规定,经合同双方共同协商,作出补充规定,补充规定与本合同具有同等效力。 十九、本合同双方签字,见证后生效。
二十、本合同一式叁份,甲乙双方各执一份,见证单位执一份。
甲方(盖章): 乙方(签字):
法定代表人:
签定日期:
见证单位:
见证代表(签字):
篇3:个人承包消防合同
发包单位: (以下简称甲方)
承包单位: (以下简称乙方)
通过甲方对乙方的考核考察与乙方的投标报价,同意将_____市_____广场防水工程委托乙方施工,为了明确双方在施工过程中的权利、义务和责任,按照确保工程质量、工程进度、工程安全的原则,协商确定如下合同条款共同遵守执行:
第一条 工程概况
1、工程名称:
2、工程地点:
第二条 工程承包范围及内容:
地下室底板,地下室侧墙,转换层顶板。
第三条 承包方式
包工、包料、包质量、包管理、包安全、包进度、含税金等总包方式。
第四条 防水材料和工程单价
1、所使用的防水材料为防水材料。
2、地下室底板防水采用
3、地下室侧墙防水采用每平方米_____
4、地下室顶板防水采用每平方米_____
本合同单价是指材料费加上施工人工费、管理费、措施费、利润、税金等一切费用,不再读取其它任何费率 。
第五条 工程计量
按实际完成的防水基层接触面的展开面积计算,其中审计图纸图集所要求节点附加防水层经双方协商按实签证,刚性层上面伸缩缝处防水油膏及防水附加卷材另外计算。每米 根据现场实际情况确定价格 元。(因甲方要求另行加强部分或增加部分按实另行签证)。
第六条 合同工期
工程按甲方正式书面通知要求结合现场实际情况为准。
第七条 付款方式
本合同签订3日之内乙方向甲方交纳合同履约金5万元(到期不付视乙方违约),于完成地下室一层防水工程后甲方一次性退还到乙方指定银行账户;
本工程无预付款,按进度(以每完成两层为支付周期)支付完成工程量的75%进度款,乙方完成甲方前期指定的工作,待甲方验收合格后即付施工区域之工程款的85%,±0.000m以下完成后半年内无渗水时再付10%,留5%作为保质金,一年内退还5%保证金中的3%,其余2%两年内退还到乙方指定银行账号。
第八条 质量标准
乙方所施工用的产品必须由国家建设行政主管部门技术监督局认可并颁发的使用认可证书和合格证书方可进入现场使用。如发现使用假冒产品或偷工减料,甲方有效拒付工程款项,并且甲方有权索赔。
乙方应确保所施工的防水工程达到优良标准,必须严格按现行的国家、 地方的质量验收规范、标准和规定要求组织施工,按国家GB5028—20____、GB5027---20____验收规范的要求验收,并接受甲方和质监部门的监督。达到_____设计厚度等质量要求,确保工程质量为一次性合格。
质量达不到验收标准时,甲方有权利要求其整改到位其费用由乙方负责,乙方根据验收规范,应无条件整改到位,防水局部完成后出现渗水由 乙方负责返工处理,直到不渗水为止,费用由乙方负责,返工整改不得影 响整体工程进度。
第九条甲方驻工地代表
甲方委派为驻施工现场甲方代表,行使合同约定的权利,履行合同约定的义务。有关甲方的指令、通知,以甲方代表签字并加盖公司项目专用章后方有效,并视其为甲方意见的有效表达。
乙方委派为驻施工现场乙方代表,行使合同约定的权利,发行合同约定的义务。乙方的要求和通知须以书面形式由乙方代表签字并加盖公章 或项目章后方可有效,并视其为乙方意见的有效表达。
第十条 双方责任与义务
1、甲方责任:
(1)应提前15天提出施工计划,督促施工单位将工作面整理达到防水施工标准提交乙方施工。
(2)应提出工期计划,但应考虑到天气及人力等不可抗拒的因素、工期顺延。
(3)配合乙方施工,协调必要的填运输、脚手架和材料场施场点,其费用乙方负责。
(4)协调与其他施工单位的矛盾。
(5)甲方有权对乙方在施工过程中的工程质量进行监督检查,发现问题,提交乙方限时整改返工。
(6)工程验收后,对防水层成品,甲方应督促施工单位保护成品,谁破坏谁负责。
防水工程完工后乙方必须提出收申请,经监理审核后报甲方,向质监部门申请,质监同意后,乙方三天内组织验收,验收合格后15天内就按合同付款,如不按期付款,四方应承担乙方的所有经济损失。
2、乙方责任
(1)按甲方的施工要求,作详细的施工方案,报甲方监理审核,听候甲方通知,及时组织防水材料进场,及时向甲方与监理提供产品合格证和检验报告单及施工的其他档案资料,由甲方现场负责人抽检合格后方可使用。
(2) 乙方应文明安全施工,施工中所有工伤事故乙方自理,甲方概不负责。
(3) 乙方必须组织有丰富经验的施工人员进场施工,对施工所有的设备必 须符合安全生产要求。
(4)配合工程的整体施工进度,按甲方提出的施工计划施工,除不可避免 的因素外,不得人为拖延。
(5)应遵守施工现场的各项规章制度,不得有违规行为,否则接受甲方各 规章制度制定的处罚。
(6)应严格按防水工程标准规范竣工,发现问题,及时自行解决,确保工 程质量达到优良标准,并对工程保修五年。
(7)在保修期内,由于乙方施工质量或施工缺陷原因引起的质量问题均由 乙方负责修复,费用由乙方承担,若非正常情况(人为破坏,私自改动防水层、自然灾害等)下漏水乙方不予以承担责任。
第十一条 违约责任
甲方在未经乙方同意,不得单方面对本工程项目进行再次转包,如发生此 情况,属违约,乙方一经发现,由此造成直接经济损失均由甲方承担。
工程质量达不到验收标准的部分,乙方就按甲方要求的时间内予以返工维复,直到符合验收标准为止,其费用与工期造成的损失由乙方承担。
工程延误或施工质量达不到规范要求,而乙方义无积极措施确保按合同工期完成,或无力按质量标准返修者,乙方应承担违约责任,甲方有权单方面 终止合同,乙方应赔偿由此造成直接经济损失。
第十二条 其他条款
1、 根据双方附属工程总承包合同,乙方有权进行分包、转包,甲方无权就此终止合同并索赔。
2、 本合同一式贰份,甲乙双方各执壹份,具有同等的法律效力。
3、 本合同执行中若有争议,先协商解决,如协商无效向人民法院诉讼解决。
4、 本合同的有效期,自签约日起至工程保修期满为合同有效期,逾期自然失效。
5、 乙方在与分包方履行合同的过程中,如因甲方原因无法支付乙方工程款导致分包方的起诉及经济纠纷时,甲方应与乙方共同处理相关事宜。
6、本合同价款现金支付或转账支付,乙方指定付款帐号为:
户名:
账号: 开户行:
甲方:乙方:
日期:日期:
篇4:个人承包消防合同
甲方:
乙方:
依照《中华人民共和国合同法》及其它国家有关法律、法规,遵循平等、自愿、诚实守信的原则,结合本工程具体情况,双方就工程承包事项协商达成一致,订立本合同。
第一条 工程概况
一、工程名称:
二、工程地点;
三、工程内容:
(1)井数 (2)井径
(3)井深 (4)开孔井径
(5)承包方式:包轻工(含如下内容:钻机具装卸车、机械定位、开凿井孔、下井管、填滤料、封闭料和固定料、下水泵、浇井、现场安全管理等)。
(6)工程总造价__________ ,工程结束后,按实际井深结算。
四、工程质量及工期要求:
(1)出水量_____吨/小时
(2)水质:附合当地同层水水质标准。
(3)含沙量:不得大于万分之一(根据国家GBJ-13-66标准)。
(4)工期:正常情况下于_____年_____月_____日开工至_____年_____月_____日竣工。
第二条 价格支付与结算
一、自合同签订之日起,五日内甲方应支付乙方_____元生活费等其它费用。
二、施工结束以最终验收合格日后七日内结清工程款。
第三条 双方责任
一、甲方责任:
1、向分包人交付具备施工条件的场地。
2、确定井位、划定施工区域,保证“水、电、路”三通。
3、负责解决乙方施工人员、生产、生活用水、用电、食宿等生活问题。
4、负责对工程质量、工期、安全生产、文明施工的控制监督、检查验收。
5、协调现场的工作关系,发现问题向乙方提出意见,共同协商解决。
6、及时配合乙方做好损毁机具的维修、保养工作,并承担零部件费用,损毁机具以旧换新。
7、及时提供井管、滤料等。
二、乙方责任:
1、乙方工作人员进入工地后应自觉遵守甲方的一切规章制度。
2、严格按照设计图纸、施工验收规范及有关技术要求,精心施工,确保工程质量达到约定的标准。
3、认真执行安全技术规范、操作规程,严格遵守安全制度,落实安全措施,做好劳动保护,确保施工安全。
4、加强现场管理,妥善保管、合理使用工程甲方提供的机具、周转材料及其它设施,做到文明施工。
5、分包人如在施工过程中出现安全事故,如人为损坏机具,人身伤害事故等,一切责任由乙方负责。
第四条 违约责任
1、未按合同要求保证工程质量,在保修期内因技术原因造成事故或成井质量问题,应无偿负责修理或重凿。
2、因乙方原因不能按期竣工,乙方应承担违约责任。
3、合同签订后即生效,任何一方终止合同或变更设计等均应双方协商,如单方违约,应向另一方赔偿合同总额的20%违约金。
4、因甲方水、电或施工场地影响而造成停产窝工,甲方应支付乙方损失费420元/台天。
第五条 双方义务
1、乙方在甲方指定的地点施工,若因水文地质和特殊自然条件造成无成井,其损失费用_____元/米,由甲方承担。
2、施工期间,若遇洪水、地震等不可抗拒的自然灾害导致水井报废时,经济损失双方各承担50%。
3、不按合同规定拔付工程款,甲方每月按滞付款的.1%加收滞纳金。
第六条 附则
1、本合同一式贰份,甲乙双方各执一份。
2、合同自签订之日起生效,竣工验收结清费用后失效。
3、本合同未尽事宜,由双方协商解决。
甲方单位;
乙方单位:
法人代表;
法人代表:
单位地址:
单位地址:
开户银行;
开户银行:
账号;
账号:
日期:
日期:
篇5:个人承包鱼塘合同
发包方:___________村民委员会(以下简称甲方)
承包方:_____________________(以下简称乙方)
为了改变传统陈旧的农业耕作形式促进农村经济的发展,甲方将集体所有的鱼塘承包给乙方,用于养殖业。根据《中华人民共和国土地管理法》、《中华人民共和国合同法》及相关法律、法规和政策规定,甲乙双方本着平等、自愿、有偿的原则,签订本合同,共同信守。
一、土地的面积、位置
甲方经村民会议同意并报乡人民政府批准,将位于_________乡______村面积_________亩(具体面积、位置以合同附图为准)
承包给乙方。
二、土地用途及承包形式
1.用途为:养殖,但乙方可以适时以合理的方式调整和优化。
2.承包形式:个人承包经营。
三、土地的承包经营期限
该地承包经营期限为____年,自_____年____月____日至_____年____月___日止。
四、地上物的处置和设施设备配套提供:(水、电、路)
为用于乙方养殖业甲方许可乙方无偿使用下列资源和设备:
五、承包金及交付方式
1.承包金每年共计人民币_____元。
2.每年_____月___日前,乙方向甲方全额交纳本年度的承包金,由甲方出具合法收据。
六、甲乙双方的权利和义务
(一)甲方的权利和义务
1.开发利用进行监督,保证按照合同约定的用途合理利用。
2.按照合同约定收取承包金;在合同有效期内,甲方不得提高承包金。
3.保障乙方自主经营,不侵犯乙方的合法权益。
4.协助乙方进行农业高新技术的开发、宣传、褒奖、应用。
5.按照合同约定,保证水、电畅通,并无偿提供通往承包地的道路。
6.按本村村民用电价格收取乙方电费。
7.为乙方提供自来水,并给予乙方以甲方村民的同等待遇。
8.在合同履行期内,甲方不得重复发包该地块,并履行相关表决和报批手续保证承包合同的合法、有效性。
(二)乙方的权利和义务
1.按照合同约定的用途和期限,有权依法利用和经营所承包的鱼塘。
2.享有承包鱼塘上的收益权和按照合同约定兴建、购置财产的所有权。
3.享受国家规定的优惠政策。
4.享有对公共设施的使用权。
5.乙方可在承包的鱼塘上建设与约定用途有关的生产、生活设施。
6保护自然资源,搞好水土保持,合理利用土地。。
7.根据需要自主决定转包或调整养殖结构或鱼塘用途。
8、遇政府拆迁、征收、征用、或其他政府政策影响享有补偿、赔偿的权利。
七、合同的转包
1.在本合同有效期内,遵照自愿、互利的原则,可以将承包的鱼塘全部或部分转包给第三方。
2.转包时要签订转包合同,不得擅自改变原来承包合同的内容。
3.本合同转包后,甲方与乙方之间仍应按原承包合同的约定行使权利和承担义务;乙方与第三方按转包合同的约定行使权利和承担义务。
八、合同的变更和解除
1.本合同一经签订,即具有法律约束力,任何单位和个人不得随意
2.在合同履行期间,任何一方法定代表人或人员的变更,都不得因此而变更或解除本合同。
3.本合同履行中,如因不可抗力致使本合同难以履行时,本合同可以变更或解除,双方互不承担责任。
4.如甲方重复发包该地块或擅自断电、断水、断路,致使乙方无法经营时,乙方有权解除本合同,其违约责任由甲方承担。
5.本合同期满,如继续承包,乙方享有优先权,双方应于本合同期满前半年签订未来承包合同,未定合同的相应顺延。
九、违约责任
1.在合同履行期间,甲方违反本合同的约定,视为违约。违约方应按乙方土地利用的实际总投资额支付对方违约金,并赔偿对方因违约而造成的实际损失包括养殖业可得利益和为重新承包相类似的鱼塘需要多支付的承包费、和重新投资。
2.本合同转包后,因甲方的原因致使转包合同不能履行,给转包后的承包方造成损失的,甲方应承担相应的责任。
十、本合同经甲乙双方签章后生效。本合同未尽事宜,可由双方约定后作为补充协议,补充协议与本合同具有同等法律效力。本合同一式_____份,甲乙双方各_____份。
甲方(公章):_________ 乙方(公章):_________
法定代表人(签字):_________ 法定代表人(签字):_________
_________年____月____日 _________年____月____日
篇6:个人承包鱼塘合同
合伙人:甲 现住址:
合伙人:乙 现住址:
甲乙双方本着公平、互利的原则订立合伙协议如下:
第一条 甲乙双方自愿合伙承包位于 鱼塘,有效水面约 亩,总投资为 元(人民币),甲出资 元(人民币),乙出资 元(人民币),各占投资总额的 %、 %。
第二条 本合伙经营期限为 年。
第三条 合伙双方共同经营、共同管理、共同劳动、共担风险、共负盈亏。
第四条 甲乙双方均可利用所承包鱼塘独自或伙同友人垂钓休闲,对方不得干涉。但垂钓应当合理适度,不影响鱼塘可持续发展。
第五条 他人可以入伙,但须经甲乙双方同意,并办理增加出资额的手续和订立补充协议。补充协议与本协议具有同等效力。
第六条 出现下列事项,合伙终止:
(一) 合伙期满;
(二) 合伙双方协商同意;
(三)合伙经营的事业已经完成或者无法完成;
(四)其他法律规定的情况;
第七条 本协议未尽事宜,双方可以补充规定,补充协议与本协议有同等效力。
第八条 本协议一式两份,合伙人甲乙双方各执一份。 本协议自合伙人签字(或盖章)之日起生效。
合伙人: (签字或盖章)
合伙人: (签字或盖章)
年 月 日
篇7:个人承包鱼塘合同
发包方:(简称甲方)
承包方:____________(简称乙方)
为了提高土地效益,促进农村经济的发展,经村两委研究决定,将村集体所有的鱼塘承包给乙方,用于养殖业。根据《中华人民共和国土地管理法》、《中华人民共和国合同法》及相关法律、法规和政策规定,甲乙双方本着平等、自愿、有偿的原则,签订本合同,共同信守。
一、土地的面积、位置
位于,四至:南至北至:东至:西至:面积为亩
二:承包期限
承包期限为____年,自_____年____月____日至_____年____月___日止
三、承包金及交付方式
1.承包金每年共计人民币大写小写,
2.每年___月___日前,乙方向甲方交纳当年度的承包金,由甲方出具合法收据。
四、双方的权利和义务
(一)甲方的权利和义务
1.保障乙方自主经营,不侵犯乙方的合法权益。
2.按照合同约定收取承包金;在合同有效期内,甲方不得提高承包金。
(二)乙方的权利和义务
1.按照合同约定的用途和期限,有权依法利用和经营所承包的鱼塘。
2、因拆迁、征收、征用、或其他政府政策影响享有补偿、赔偿的权利。
3、.本合同期满,如继续承包,乙方享有优先权,
本合同经甲乙双方签章后,即具有法律约束力,任何一方法定代表人或人员的变更,都不得变更或解除本合同。本合同未尽事宜,可由双方约定后作为补充协议,补充协议与本合同具有同等法律效力。
本合同一式三份,甲乙双方各一份。鉴证机关或证明人一份。
甲方:大北洛村民委员会法人代表:
乙方代表:
鉴证机关或证明人:
年月日
篇8:个人承包饭堂合同
甲方:
乙方:昆山市家禾管理服务有限公司(以下简称乙方)
根据《中华人民共和国合同法》及其他有关法律规定,甲乙双方在友好合作的基础上,经双方协商同意,就乙方承包经营甲方食堂达成以下最新食堂承包合同范本:
一、 承包项目:甲方的员工食堂
二、 承包方式:
1、 甲方为乙方免费提供厨房、餐厅及厨房一般的设备,在经营期间,必须要更新厨房设备时,乙方应用书面提出申请并呈报甲方,经甲方核准后,由甲方负责购买。
2、 在经营承包期间,食堂的燃气由乙方自行负责,费用由乙方负担。
食堂的设备人为损坏,由乙方负责修理或补充,食堂内的清洁卫生及下水道在甲方监督下由乙方管理,因管理不善造成的问题,由乙方自行负责解决。
3、 食堂厨师和服务员的薪资、餐厅清洁卫生工作及清洁剂之类的用品与日常行政管理所发生的费用均由乙方负责。
三、 双方的权利及义务:
(一)、甲方的权利与义务
1、 甲方对乙方的进菜、配菜、营养搭配、市场行情、卫生状况及服务水平进行全面临督,使其合法并按照合同履行责任,对不合理现象,有权责令修改并要求乙方不断提高管理水平。
2、 乙方所购用之食材与材料,均应保证由合格之厂商供应,甲方有权去供应商了解清洁及卫生条件。
因乙方提供不洁食物造成甲方人员食物中毒或身体不适,经医院确诊后,则由乙方负责赔偿甲方员工因医疗因素而引起的实际经济损失并承担相应的法律责任。
3、 甲方做好厨房及餐厅的治安情况,并加强就餐员工的素质教育与训练。
4、 甲方负责提供各阶段就餐的大约人数,一旦有较大人员变动时立即通知乙方。
(二)、乙方的权利与义务
1、 甲方员工如未按就餐时间规定的,乙方工作人员有权拒绝其就餐。
2、 厨房的泔脚料应由乙方自行处理。
3、 厨房作业中产生的垃圾应由乙方自行清理,因此产生的一切后果由乙方承担。
4、 公司员工就餐用之餐具应为本公司员工专用,严禁给非本公司员工使用。
5、 废水、废汽、废弃物之排放、处置应符合国家及地方相关环保法律法规规定,若未相符,须立即配合甲方进行整改。
6、 配合本公司之环境政策、安全健康进行改善及管理。
7、 遵守国家和地方的安全卫生规定,做到优秀服务,文明服务,严格把好菜肴的质量关,绝对禁止腐烂变质的食物进入食堂。
篇9:个人承包钢结构合同
委托方:(以下简称甲方)
承包方:(以下简称乙方)
依照《中华人民共和国合同法》及有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,双方就钢结构构件加工制作事宜协商一致,订立本合同。
第二条:工程概况
1.工程名称:
2.工程地点:
3.委托方:
4.预估构件重量:
5.工程内容:
第三条:合同范围及签定合同依据
1.甲方认可的施工图纸。
2.甲方认可的设计变更,补充联系单,图纸会审纪要。
第四条:生产(加工)工作内容
1.主钢构:
2.主钢构除锈处理方式:抛丸除锈。
3.防锈底漆涂装要求:
4.乙方负责免费装车,甲方负责运输,运输费用由甲方承担。
第五条:甲方的权利和义务
1.甲方于年月日前向乙方提交生产(加工)用施工图纸套。
2.按合同规定的时间、数量、付款方式支付加工费、材料费。
3.甲方代表有权监督加工的进度和质量。
第六条:乙方的权利和义务
1.按时提交加工产品,并经甲方在车间验收合格后方可出厂。
2.按国家现行钢结构施工验收规范GB50205-20xx及设计图纸要求进行生产。
第七条:加工费及付款方式、时间
1.本生产人工费单价为:元/吨。
2.材料费单价:本结构原材料按购买时双方核定的市场价格计价。
3.工程款支付:预付材料款70%计元(大写:元整)。
4.提构件时付清本批钢构件30%的余款。
5.重量结算:按理论重量结算;材料损耗按4%计算(损耗不计入加工
6.如图纸变更或委托方要求变更,需另追加费用,计费标准按1、2条进行。
第八条:生产(加工)期限
1.开工日期:以收到甲方全部图纸及材料款到帐后第二天起计算工期。
2.工期:天。
3.工厂存放期:构件完工之日起免费在厂内存放7天,超出7天每天按产品总价款的5‰收取场地占用费。
4.遇到下列情况之一时,生产(加工)产品开工日期及产品交验日期则相应顺延或另外商定:
1)由于不可抗力或无法防止的外因影响时;
2)由于甲方的'原因影响生产(加工)进度时。
第九条:违约责任
1.由于产品质量问题,不能满足施工图纸要求时,应由承包方无偿返工或重新提供产品。
2.由于委托方提供的图纸不十分正规,在承包方开始生产后仍在修改设计,由此造成的损失委托方应给予承包方相应的经济补偿,并工期顺延。
第十条:其它
1.产品经甲方验收合格出厂后,由于运输或其它非乙方原因而影响了质量,乙方不再承担责任。
2.根据本合同的约定,乙方只对甲方承担其应尽的责任和义务,而不再与第三方发生业务关系,甲方只对乙方承担其应尽的责任和义务,不受第三方的影响。
第十一条:附则
1.与本合同有关的其它问题,均按《中华人民共和国合同法》的规定执行,未尽事宜,双方协商解决。
2.本合同一式四份,甲方各执二份。
3.双方代表签章后,合同生效。
委托方:承包方:
日期:
篇10:个人承包钢结构合同
甲方:
乙方:
根据《中华人民共和国合同法》、《中华人民共和国劳动法》和《建筑工程承包合同条例》规定,及其他有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,结合本工程具体情况,双方达成以下条例:
一、工程内容:
预埋件、主钢结构系统、彩钢瓦、墙面系统、屋面系统、门窗工程的制作安装、油漆、设计费等,。
二、承包方式:
包工包料、包质量、包工期、包安全
三、工期:
经甲乙双方协商,本工程从_年_月_日始至_年_月_日结束。如遇不可抗力因素,(如战争、地震、雨天等)工期顺延。
四、质量及技术标准:
所有材料必须达到合格,由乙方质量人员现场检测,施工质量达到国家标准。
五、双方责任:
1、甲方充分说明施工要求,如有变更,及时给予解答,甲方提供原材料堆放场地;提供电源及电表箱以上电线,配合乙方解决施工中出现的问题。
2、乙方认真领会施工要求,按要求施工,同时提供各单项目的材料报告,如需现场复查,可联系沟通,但费用甲方承担,在施工过程中,乙方要准守国家的法律法规,工程质量确保合格。
3、乙方应为甲方喷两到三边底漆,确保钢材长久使用。
六、付款方式:
1、本工程钢结构建筑面积:约_平方米,工程总价为_万元,合同签订3日内,先预付材料款40%,钢结构进场后再付10%,待工程完工后经检查合格15日内全部付清余下款项,合同总价3%的质保金除外。
2、若因甲方拖欠乙方工程款,影响工程进度,造成乙方停工、窝工而带来的各种损失,应由甲方承担。
七、安全施工:
乙方工人进入工地,必须遵守工地的安全规范,统一安排,自备安全用品。高空作业,必须系安全带,配带安全帽,使用电气设备要规范,必须安全可靠,特别室外用电要防水,接地,配电箱要配备漏电保护器,以防为主,安全施工。如发生不安全事故,一切责任由乙方自负,甲方不承担任何事故责任及经济损失。
八、开工及延期开工:
(1)乙方应按合同约定的工期开工。
(2)因甲方原因造成不能按合同约定的工期开工,甲方应在合同约定的开工日期前2天,以书面形式通知乙方,推迟开工日期;并相应顺延工期。如甲方没有提前通知乙方,给乙方造成的开工损失由甲方承担。
九、工程质量:
1、乙方对钢结构工程的施工安装质量和其所提供的材料、制作的构件质量负责。
2、乙方必须严格按国家有关规范、规程、标准的要求制作施工。
3、乙方应按钢结构工程质量验收规范对分项、分部工程质量进行评定。钢结构工程主构件安装完工时,应通知甲方代表进行中间结构验收。
4、工程保修期为一年。在质保期内,如有工程质量问题乙方应给予及时维修。
十、争议:
本合同在履行过程中如发生争议,双方应协商解决,协商不成的,可向工程所在地仲裁委员会仲裁或直接向各自所在地人民法院提起诉讼。
本合同一式两份,甲乙双方各持一份。工程结算完毕,付清工程款后,合同自动失效。
甲方:(签章)乙方:(签章)
日期:
篇11:个人承包工地合同
发包人:(以下简称甲方)
承包人:(以下简称乙方)
依照《中华人民共和国合同法》、《中华人民共和国建筑法》及其他有关法律、法规,遵循平等、自愿、公平和诚实信用的原则,就本建设工程协商一致,订立本合同,供双方遵照执行。
一、工程概况
1、工程名称:
2、工程地点: ;
3.工程范围:
1).房屋整体结构,(详见施工图纸内容);房屋顶棚,由图纸的四坡形,更改为两坡形前后出橼,上顶红瓦,坡度以出水通顺为宜。
2).室内石膏板顶棚,电路穿线,墙面,水泥地面。
3).室外装修,四面墙,三面清水墙,走廊正面其它按图纸施工。
4、承包方式:_ 。
二、合同工期
开工日期: 年 月 日 ,竣工日期 年 月 日 ,合同工期总天数 天(以实际进场施工之日算起);
三、质量标准
工程质量标准:合格、按照《钢结构施工质量验收规范》验收。
四、合同价款
总计合同金额(大写)(人民币) ,小写¥ 。
五,付款方式
分二次付款:
六、施工准备
1、承包人在合同签定后 日内免费完成图纸的设计和细化,完成后由发包人提交给设计院,承包人协同参与技术交底以便图纸通过。
2、发包人在施工前应负责做好三通一平工作,提供基准测量点,免费提供施工用水、电;
七、安全责任
1、甲方指导乙方组织实施,检查乙方施工安全设施。
2、乙方应指派专人负责安全,施工现场应有安全标示和安全设施。
3、乙方在施工过程中出现责任事故,乙方负全部责任,甲方概不负法律和经济责任。
八、工程竣工验收及保修
1、承包人在工程竣工前三日内,应将验收日期以书面形式通知发包人届时验收,如发包人不能按期参加验收,须提前通知承包人,并与承包人另行商定验收日期,但发包人必须承认承包人的竣工时间;发包人推迟验收,其间所发生的管理费和其他损失均由发包人承担;
2、发包人收到承包人的验收通知未提出异议,但到期又不按期组织验收或发包人提前使用的,视为验收合格;
3、竣工工程经验收合格之日,办理工程移交,从验收之日起三日内移交完毕,如发包人不按期接管,致使工程发生损失,应由发包人承担;
4、工程已基本竣工,如遇某种材料或设备双方均无法解决,致使该项工程不能全部按期竣工,可作减项竣工,并对已完成工程进行竣工验收和办理移交手续;
5、自工程竣工验收合格之日起壹年内承包人对工程负责免费保修,保修期限届满后,承包人提供终身优惠服务。
九、现场代表
发包人现场代表_____,承包人现场代表_ _,双方代表的权利义务按本合同约定,解决工程中所遇问题的协商、及决策意见的签证、处理;如一方换人时应提前三天书面通知对方。
十、违约责任
一方违约时,除前面条款另有约定外,违约方支付违约金 万元。 本合同以双方签字盖章后生效,一式二份,发包人与承包人各执一份。 合同订立时间:___年___月___日
甲方(公章):_________ 乙方(公章):_________
法定代表人(签字):_________ 法定代表人(签字):_________
_________年____月____日 _________年____月____日